New construction driveway and apron
Poured for a builder while the house was still in framing, which is the right time to do it. The pad runs from the street all the way to a three car garage, with the apron widened out so two vehicles can pass without anybody riding the edge.
The curved side was formed by hand rather than cut in afterward. Joints went in the same day the slab was finished so the concrete cracks where we put the line instead of wherever it wants to.